Activity Structural Feasibility study of 3-legged platform for extension of workspace
Client Abu Dhabi Oil Company Ltd (JAPAN)
Place Abu-Dhabi, U.A.E.
Period 7 sep2014 – 10th Dec’2014.
SCOPE OF WORK:
Phase I: To perform structural feasibility study on Jacket & pile foundation on 3-leg CD-7.
Phase II: To perform detail modeling of the deck structure & for additional loading feasibility study of 3 Legged well protection platform.
Clients