Structural Feasibility study of 3-legged platform (“CD-7”) for extension of work space (Stage 1 & 2)

Activity  Structural Feasibility study of 3-legged platform for extension of workspace

Client     Abu Dhabi Oil Company Ltd (JAPAN)

Place     Abu-Dhabi, U.A.E.

Period   7 sep2014 – 10th Dec’2014.

SCOPE OF WORK:

 

Phase I: To perform structural feasibility study on Jacket & pile foundation on 3-leg CD-7.

Phase II: To perform detail modeling of the deck structure & for additional loading feasibility study of 3 Legged well protection platform.

Clients
Products Tags