1 Rompetrol through Leighton 40 - 26 Midia Marine Terminal at Black Sea, Romania May ‘08 to Aug ‘08
GENERAL SCOPE
As a part of the construction engineering support, the installation Contractor had engaged the services of MR Vision Pipelines to carry out the Construction and Installation Engineering for the offshore pipeline. The software “MOSES” & “OFFPIPE” are used and the analysis details are:
• Quasi-static Mooring Analysis during Shore Pull.
• Quasi-static Mooring Analysis during pipe-lay operation.
• Pipeline Conventional Pipe lay Analysis – Static.
• Pipeline Conventional Pipe lay Analysis – Dynamic.
• Termination Analysis; Abandon & Recovery Analysis.