Kencana Dana LWS Installation Engineering services

Activity  Transportation, Rigging, Sea-Fastening, Lifting and Related Analysis and Pile Drivability / Stickup / Impact Studies.

Client     Momentum Engineering Dubai, UAE, For PETRONAS, Malaysia.

Place     Malaysia

Period   April 2011 to Jun 2011.

 

We glad to inform you that, MR Vision & Momentum used a Jack-up Rig (without mobilization of an installation Derrick barge) for OFFSHORE LIFT AND INSTALLATION of Platform Jacket, Deck and Boat-Landing in 50m of water for PETRONAS, PCPP, in Malaysian waters. This is highly appreciated by the industries in this region. This timely and successfully demonstrated Innovative & most cost-effective method is given more confidence to the small & marginal field operators to adopt similar cost-effective methods in this region.

 

1. Load out Analysis:

•             Transportation analysis of jacket and deck to the Jetty (trailer transportation)

•             Load out analysis (lifted load out from Quay to the transportation vessel)

•             Barge/transportation vessel ballast analysis for load out.

 

2. Transportation & Sea Fastening:

•             Transportation analysis of the Jacket

•             Transportation analysis of deck

•             Sea fastening design of deck

•             Sea fastening design of Jacket

•             Barge local strength analysis

•             Barge stability and ballast analysis during transpiration.

3. Lifting and upending

•             Lift analysis for jacket for various critical positions of jacket (horizontal, vertical, inclined etc. as required) based on the installation procedure.

•             Lift analysis for deck for various critical positions of deck as required based on the installation procedure.

•             Design of lifting padeyes, Design of trunnions etc.

•             Design of bumpers on the vessel during jacket upending.

•             Lift analysis for deck for various critical positions of deck as required based on the installation procedure.

•             Vessel ballast calculations for various phases of the jacket upending/lifting operations.

 

4. Unpiled Stability Analysis

•             Perform unpiled stability analysis.

•             Check the adequacy of mud mat for the operation

 

5. Pile Driving Analysis.

•             Perform pile drivability analysis using GRL WEAP.