Period: 2018
Activity Engineering Services for Construction of New Shelter for Odorant Day Tank
Client TAKREER through GOGAS
Place Abu-Dhabi, U.A.E.
Period May – Aug. 2018
The scope involves Engineering study and Integrity check for Odorant Tank shelter.
The engineering Scope of Work for the Project includes:
- Structural Design Calculations for the Shelter using STADD Pro
- Design Calculations for column foundations
- Shelter Layout Plan
- Shelter column foundation layout
- Column Foundation GA and details
- Shelter G.A drawing and details
- Civil & Structural MTO
Clients