MRV carried out inspection of the Voids and provide an inspection report which included site inspection and mark-ups on existing drawings showing the inspection locations, corroded area, and UTG/MPI Inspection data.
Activity | Structural stability investigation and recommendation for method of repair works on corroded leg well supports of trident VII-A at "CFP"- (Stage-1 & 2) |
Client | ABU DHBAI OIL COMPANY LTD (JAPAN) |
Place | Abu-Dhabi, U.A.E. |
Period | Jan' 2014 - April' 2014 |
STAGE-1
MRV carried out inspection of the Voids and provide an inspection report which included site inspection and mark-ups on existing drawings showing the inspection locations, corroded area, and UTG/MPI Inspection data.
STAGE-2
Stage -2 involved structural stability investigations based on the site inspection data and the existing structural members to be strengthened / replaced will be identified. A report on structural stability study prepared which included the following but not limited to.
- Basis of the study, Mark-ups on the existing drawing showing the existing members to be strengthened / replaced.
- Repair procedure/methodology for the marked areas / locations.
- Specifications required for the repair works, Drawings for temporary support if any required for repair work.
- Typical Drawing for repair / modification of existing structure/ modification required for accessing repair location /Construction.
- MTO
Clients