BDEP for rectification of the existing VDU and upgrade of foam skid system at Mina Al Fahal Oil Terminal for Shell, Oman.

Period: 2017

Activity  Redesign the existing VAPOUR DISPOSAL UNIT (VDU)

Client     Shell Oman Marketing Company SOAG (COMPANY) through Smart Technical Services-LLC

Place     Mina Al Fahal, Oman

Period   June 2017 – Sept’ 2017

 

Basic Design Engineering Package (BDEP) to rectify the deficiencies in the existing Vapour Disposal Unit (VDU) by redesign and carrying out necessary modifications to overcome the present unacceptable level of Mogas Smell (odour) experienced in the Terminal.

Clients