FEED & DETAILED ENGINEERING FOR THE DECK EXTENSION AT THREE LEGGED PLATFORM "CD-7" FOR INSTALLING CONDUCTOR SLOT.

To carry out the design of deck extension and other modifications required in the Platform structure to accommodate new well & facilities.

Activity FEED & Detailed engineering for the deck extension at "CD-7" Platform for installing conductor slot.
Client M/s ABU DHBAI OIL COMPANY LTD (JAPAN)
Place Abu-Dhabi, U.A.E.
Period Feb'2015 - June 2015

To carry out the design of deck extension and other modifications required in the Platform structure to accommodate new well & facilities. The design shall be carried out based on the finalized layout and equipment data by ADOC.

Deck extension Design & Drawing

The Detailed design of the new deck extension (size 2.4M x 7.9M) for accommodating New Well and associated facilities will include the following.

  • Review of Existing data based on the site conditions,
  • Deck Extension Platform Layout
  • Structural Design Calculations
  • Deck extension G.A Drawings and Sectional drawings including connection details.