CONCEPTUAL STUDY FOR STRUCTURAL STABILITY INVESTIGATION AND RECOMMENDATION FOR METHOD OF REPAIR WORKS ON CORRODED LEG WELL SUPPORTS OF TRIDENT VII-A AT "CFP"- (STAGE-1 & 2)

MRV carried out inspection of the Voids and provide an inspection report which included site inspection and mark-ups on existing drawings showing the inspection locations, corroded area, and UTG/MPI Inspection data.

Activity Structural stability investigation and recommendation for method of repair works on corroded leg well supports of trident VII-A at "CFP"- (Stage-1 & 2)
Client ABU DHBAI OIL COMPANY LTD (JAPAN)
Place Abu-Dhabi, U.A.E.
Period Jan' 2014 - April' 2014

STAGE-1

MRV carried out inspection of the Voids and provide an inspection report which included site inspection and mark-ups on existing drawings showing the inspection locations, corroded area, and UTG/MPI Inspection data.

STAGE-2

Stage -2 involved structural stability investigations based on the site inspection data and the existing structural members to be strengthened / replaced will be identified. A report on structural stability study prepared which included the following but not limited to.

  • Basis of the study, Mark-ups on the existing drawing showing the existing members to be strengthened / replaced.
  • Repair procedure/methodology for the marked areas / locations.
  • Specifications required for the repair works, Drawings for temporary support if any required for repair work.
  • Typical Drawing for repair / modification of existing structure/ modification required for accessing repair location /Construction.
  • MTO