Activity To carry-out Residual Engineering for Construction of plant modification project PMP 736,768 & 790.
Client BOROUGE Thro GOGAS
Place Abu-Dhabi, U.A.E.
Period 14TH Jan’2015 - April'2015
Borouge management undertakes various ongoing improvements for the production and reliability in operation units of Borouge-1 and 2. Borouge intends to carry out the following modifications to the existing facilities.
OL- 736: To divert/Partially PO off gas to EU2 as it is in EU1
OL-768: Additional 10” cooling water supply and return lines are to be provided to EU2 boiler from B1 U&O as back up.
OL-790: Interconnection 20% Fresh Caustic from U & O2 and U & O.
SCOPE OF RESIDUAL ENGINEERING SERVICES
Residual engineering envisaged are listed below.
• Verification for any conflicts between specifications, engineering drawings and codes & standards.
• Verification of the design drawings and documents for contradictions if any.
• Site survey to review the existing facilities in order to collect and verify on-site all relevant data, documents, as built drawings, physically check, take necessary measurements, constructability.
• As-built existing facilities if existing installation details are not available Residual field construction engineering